Difference between revisions of "Dragon General Operation"

From Bend-Tech 7x Wiki
Jump to: navigation, search
Line 30: Line 30:
 
[[File:Dragon_Machine_Operations_Center_Gate2.JPG]]
 
[[File:Dragon_Machine_Operations_Center_Gate2.JPG]]
  
*If the chuck is positioned behind the center gate upon sending it to load position and after loading the tubing for a project, the square center gates will need to be closed manually. This will require swinging the gates into position enveloping the tube, then pulling out the actuator switch behind the gate to secure it. NOTE: The gate on the right side of this picture will need to be closed first.
+
*If the chuck is positioned behind the center gate upon sending it to load position and after loading the tubing for a project, the square center gates will need to be closed manually. This will require swinging the gates into position enveloping the tube, then pulling out the actuator switch behind the gate to secure it. NOTE: The gate on the left side of this picture will need to be closed first so that the gate's flat plates rest on each other.

Revision as of 10:56, 15 May 2017

Important Machine Operations and Procedures

Powering on/Shutting down Sequence

  • The sequence in which the machine/hardware and software are turned on and off is very important. Please follow the instructions as shown here:

Machine Operations1.png


Operating the Gates

  • The operation of the gates, whether front round, front square, center round or center square, will be conducted on an as needed basis. The movement and adjustment of these gates will not be necessary for every tube/pipe loaded into the Dragon machine. Adjust the gates only when loading a different OD material than the material that was used beforehand.

Front Gate (Round)

Dragon Machine Operations Front Gate1.png

Front Gate (Square)

Dragon Machine Operations Front Gate2.png

Center Gate (Round)

Dragon Machine Operations Center Gate1.png

  • If the chuck is positioned behind the center gate upon sending it to load position and after loading the tubing for a project, the round center gate will need to be closed manually. This will require swinging the gate into position enveloping the tube, then pulling out the actuator switch behind the gate to secure it.

Center Gate (Square)

Dragon Machine Operations Center Gate2.JPG

  • If the chuck is positioned behind the center gate upon sending it to load position and after loading the tubing for a project, the square center gates will need to be closed manually. This will require swinging the gates into position enveloping the tube, then pulling out the actuator switch behind the gate to secure it. NOTE: The gate on the left side of this picture will need to be closed first so that the gate's flat plates rest on each other.