Dragon General Operation

From Bend-Tech 7x Wiki
Revision as of 13:26, 11 May 2017 by Fabcam1 (talk | contribs)
Jump to: navigation, search

Important Machine Operations and Procedures

Powering on/Shutting down Sequence

  • The sequence in which the machine/hardware and software are turned on and off is very important. Please follow the instructions as shown here:

Machine Operations1.png


Operating the Gates

  • The operation of the gates, whether front round, front square, center round or center square, will be conducted on an as needed basis. The movement and adjustment of these gates will not be necessary for every tube/pipe loaded into the Dragon machine. Adjust the gates only when loading a different OD material than the material that was used beforehand.

Front Gate (Round)

Dragon Machine Operations Front Gate1.png

Front Gate (Square)

Dragon Machine Operations Front Gate2.png

Center Gate (Round)

Dragon Machine Operations Center Gate1.png

Center Gate (Square)

File:Dragon Machine Operations Center Gate2.png