Dragon General Operation

From Bend-Tech 7x Wiki
Revision as of 16:10, 15 January 2018 by Fabcam1 (talk | contribs) (Items that need to be in place)
Jump to: navigation, search

Important Machine Operations and Procedures

Power on/Shut down Sequence

  • The sequence in which the machine/hardware and software are turned on and off is very important. Please follow the instructions as shown here:

Machine Operations1.png

Homing the Machine

When to home1.png

Operating the Gates

  • The operation of the gates, whether front round, front square, center round or center square, will be conducted on an as needed basis. The movement and adjustment of these gates will not be necessary for every tube/pipe loaded into the Dragon machine. Adjust the gates only when loading a different OD material than the material that was used beforehand.

Front Gate (Round)

Dragon Machine Operations Front Gate1.png

Front Gate (Square)

Dragon Machine Operations Front Gate2.png

Center Gate (Round)

Dragon Machine Operations Center Gate1.png

  • If the chuck is positioned behind the center gate upon sending it to load position and after loading the tubing for a project, the round center gate will need to be closed manually. This will require swinging the gate into position enveloping the tube, then pulling out the actuator switch behind the gate to secure it.

Center Gate (Square)

Dragon Machine Operations Center Gate2.JPG

  • If the chuck is positioned behind the center gate upon sending it to load position and after loading the tubing for a project, the square center gates will need to be closed manually. This will require swinging the gates into position enveloping the tube, then pulling out the actuator switch behind the gate to secure it. NOTE: The gate on the left side of this picture will need to be closed first so that the gate's flat plates rest on each other.

Standard Operation Guide

Upon sending a nesting project to the machine, a few established connections and programs need to be in place. If you have questions about these connections and programs, refer to your Bend-Tech Dragon Checklist and/or contact a Bend-Tech Support Technician for further clarification.

Items that need to be in place

  • Mach 3 must be running (either opened manually beforehand or forced to open from Dragon CAM when you click the Transfer to Machine button) and all electronic connections must be secured according to the Dragon Electronic Connections guide.
  • Mach 3 must be running the Dragon or Dragon Square profile depending on whether you are cutting round or square material. The material in the nest that is sent to the Dragon Machine from the nesting project will determine which profile is opened unless the Mach 3 software is opened beforehand.
  • The RESET button on your Machine Controller must be clicked so that it is steady GREEN. A RED (flashing red and green in Mach 3) reset button indicates that your Mach 3 software is not connected to the Dragon Machine.
  • The machine must be homed completely using the HOME ALL AXIS button unless it has already been homed and Mach 3 has not been shutdown after the homing process has been completed. NOTE: Home the machine after every calibration and anytime a crash has occurred during operation of the machine. Also, if there is ever any grinding noises coming from any of the motors during operation. Of course, if your motors are grinding, you may have your cutting feed rates set to high and/or you have an issue of torque in a certain motor. In these cases, contact a Bend-Tech Support Technician to assist you in resolving any outstanding issues.